Realizations

Year Description Owner Work donor Contract
amount
2003 Restoration of the mechanical and electrical equipment and of the crest gate controls at the Hemmings Falls Generating Station
Hydro-Quebec HMI Construction Inc. 0,2 million
1999-2000 Restoration of locks # 3, 4 and 5 on the Lachine Canal
Public Works Canada   12 million
1999 Repairs to the pilings of the Chaudiere River Bridge in St Redempteur (Quebec) Canadian National   0,5 million
1998 Reconstruction of the transfer slabs at the La Romaine Dock Public Works Canada   1 million
1997 Restoration of the Chambly canal's lock # 4 Public Works Canada   2 million
1997 Restoration of the underminings at the Port of Montréal Port of Montreal   1 million
1997 Repair of the lock's foundation raft at the Port of Quebec Marina Port of Quebec Society   2 million
1995-2007 Restoration of hydrants and vacuum system of the Beauharnois power station Hydro-Quebec HMI Construction Inc. 22 million