Realizations

Year Description Owner Work donor Contract
amount
2010-2011 Construction of a 4 MW mini hydroelectric power station
Énergie Edmundston   11 million
2010-2011 Reconstruction of the Mekinac dam and spillway
Hydro-Québec   4,2 million
2009-2011 Concreting of the Sarcelle powerhouse and intake structure and other works (partnership with Hamel Construction Inc.)
SEBJ   89 million
2009-2010 Civil engineering works (earthwork, sheetpiling and piling) at the Rivière-des-Prairies power station
Hydro-Québec   1,3 million
2008-2010 Construction of a 8 MW Powerhouse in Peterborough (Ontario)
Trent Rapids Power Corporation   18 million
2007-2010 Water structures - Tailrace - Northern sector - Eastmain Powerhouse 1-A - Sarcelle Rupert (partnership with Hamel Construction Inc.)
SEBJ   52 million
2007-2008 Construction of the solid radioactive waste management facility - phase I at the Gentilly II Generating Station
Hydro-Quebec   11 million
2006-2007 Site restoration and removal of temporary installations at the Mercier Generating Station Hydro-Quebec   2 million
2005-2009 Reshaping of the draft tube at the La Tuque Generating Station
Hydro-Quebec   18 million
2005-2009 Supply and installation of the water intake gates and trash rack at the La Tuque Generating Station
Hydro-Quebec   21 million
2005-2008 Construction of a 24mw Powerhouse in Marathon (Ontario)
Umbata Falls Ltd (Partnership between Innergex II and Ojibways of the Pic River First Nation)   26 million
2005 Electrical and related works, civil engineering works and control and phone works at the Mercier, Grand-Remous and Maniwaki Generating Stations Hydro-Quebec   2,5 million
2004-2006 Pressure pipe and mechanical equipment installation at the intake of the Mercier Dam
Hydro-Quebec   23 million
2004 Restoration of the Morin Dam - Phase II in St-Alexandre de Kamouraska Ministère de l'Environnement   3 million
2003-2005 Construction of an 8 MW hydroelectric generating station in Trenton (Ontario)
Glen Miller Power LP (Innergex II)   12 million
2002 Construction of an oil waste basin at the Jeanne d'Arc Station in Montreal Hydro-Quebec   3 million
2001-2002 Construction of the east building at the Beauharnois Generating Station
Hydro-Quebec   17 million
1999 Restoration of the Great Falls Dam in Bathurst (New Brunswick)
Smurfit-Stone    
1997-1999 Construction of the west building at the Beauharnois Generating Station (partnership with HMI Construction)
Hydro-Quebec   35 million
1995-2005 Restoration of the water intakes and draft tube at the Beauharnois Generating Station Hydro-Quebec HMI Construction Inc. 22 million
1995 Construction of an hydroelectric station in Windsor (Quebec) Hydro-Windsor HMI Construction Inc. 2 million
1994 Redevelopment of the hydroelectric station in Drummondville (Quebec) Hydro-Quebec   2 million
1993-1994 Construction of a 6 MW hydroelectric station in St Lambert (Quebec)
Boralex Inc.   4 million
1993 Construction of a 2 MW hydroelectric station in St Hyacinthe (Quebec) Boralex Inc.   2 million
1990 Expansion of the Gentilly Nuclear Generating Station Hydro-Quebec   5 million