ANDRITZ - MUSKRAT FALLS POWERHOUSE (SECOND PHASE)

Project category

Energy

Location

Happy Valley-Goose Bay, NL

Value($)

59 800 000

Customer

Andritz Hydro Canada

Year

2018-2019

 

Additional informations

Installation of hydromechanical equipment at the Muskrat Falls generating station of 824 MW, supply and installation of second phase concrete. Contract realized in partnership with Canmec Industriel.

Main work performed

  • Supply and installation of necessary accesses for the realization of the jobs, including hydro mobile type access systems
  • Supply and installation of temporary shelters for every draft tube sluiceways and of the water intake
  • Installation of embedded parts of trash racks, of valves and of water intake beams
  • Installation of embedded parts of intake valves
  • Installation of lift system of valves, of beams and of trash racks
  • Second phase formwork and concreting of embedded parts of trash racks, of valves and of water intake beams
  • Second phase formwork and concreting of intake valves embedded parts
  • Supply and concrete transportation