Our quality seal,
visible across canada.

HQ - HYDROELECTRIC PROJECT - JUDITH-JASMIN SUBSTATION

Project category

Energy

Location

Terrebonne, QC

Value($)

6 900 000

Realisation mode

Fixed Price

Customer

Hydro-Québec

Year

2016-2017

 

Additional informations

Construction of a 735-kV control building, a 120-kV control building and a workshop

Main Work Performed

  • Building the foundations including all the concrete parts of the foundation, and the buildings’ steel structures
  • Architectural work of the outer shell of the building and their components
  • Interior construction work
  • Mechanical and electrical work to complete the construction of the buildings
  • Preparatory work to secure the buildings and insure safety
  • Construction of a septic tank and a disposal field at the workshop
  • Excavation, backfilling and finishing levelling work of the buildings and around the buildings
  • Building a rainwater catch basin and pipes to direct the rainwater toward ditches
  • Building the foundations for the bridge of the transmission line
  • Building the pylon’s foundations
  • MALT work